Hydraulic analysis for 6th October city Water Distribution System

Hydraulic analysis for 6th October city Water Distribution System

Client : CAPW
Location : 6 October city      
Date : 2008
Duration : 2008-2010
Cost : 1,000,000,000 EGP
Scope :
  • Study the water consumption
  • Master plan and the results of hydraulic analysis of the future status and detailed description of the development alternatives and its estimated cost.
  • Water plants: the alternatives available to balance between the future water demand and energy of current production.
  • Water networks and lifting pumps and reservoirs: basic options for the development of potable water networks and storage capacities and locations of reservoirs.