Preparation of Master Plan and details of high priority projects For Potable Water and Sanitary Drainage System of Governorate of Qena

Preparation of Master Plan and details of high priority projects For Potable Water and Sanitary Drainage System of Governorate of Qena

Client : HCWW
Location : Governorate of Qena
Date : 2007
Duration : 2007-2009
Cost : 800,000,000 EGP
Scope :
  • Study the water consumption and sanitation needs.
  • Master plan and the results of hydraulic analysis of the future status and detailed description of the development alternatives and its estimated cost.
  • Water plants: the alternatives available to balance between the future water demand and energy of current production.
  • Sewage plants and pumping stations: the alternatives available to balance between the requirements of future sewage treatment plants and capacity of current treatment plants.
  • Water networks and lifting pumps and reservoirs: basic options for the development of potable water networks and storage capacities and locations of reservoirs.
  • Networks, wastewater collection: basic options for the development of sewage networks.