Water Intake, boosters, and transmission line for 6th October City Water Purification Plant with capacity 1,700,000m³/day

Water Intake, boosters, and transmission line for 6th October City Water Purification Plant with capacity 1,700,000m³/day

Client : Orascom and Hassan Allam’s Sons (Joint Venture)

Location : 6th of October

Date : Nov 2009

Duration : 36 months

Cost : 2,154,000,000 EGP

Scope :

- Detailed designs for the pipeline from the intake to the water purification plant

- Detailed designs for the boosters with capacity 1,700,000m3/day length 40 Km