Integrated Sanitary Drainage at Gharbia Governorate – funded by World Bank

Integrated Sanitary Drainage at Gharbia Governorate – funded by World Bank

Client : NOPWSD
Location : Gharbia Governorate
Date : 2008
Duration : --
Cost : 70,000,000 EGP
Scope :
• Upgrading and rehabilitation of the existing wastewater treatment plant with capacity 40,000m3/day
• Extension works for the WWTP with capacity 60,000m3/day to reach total capacity 100,000m3/day (Secondary treatment)
• Upgrading and rehabilitation of 150 Km sewer network
• Upgrading and rehabilitation of 7 pump stations, 7 force main,