Abu Oweikal transmission line with a total length of 36 km and purification plant with a capacity of 500,000 m3/day
Project consists of Intake pump station, booster pump
station, Purification plant and two Transmission lines
-
Intake
pump stations include 4 pumps with capacity 2000l/sec and 120 m head
-
Booster
pump station includes 4 pumps with capacity 2000l/sec and 21 m head
-
Water
purification plant capacity 500,000 m3/day
-
Two
Transmission lines with 16 Km length each.
Each line is of 1400mm diameter
and 16 bars operating pressure.
- Design calculations and detailed drawings
- Preparation of tender documents.
- Review, Approval of shop drawings, technical submittals & As-built drawings.
- Construction supervision.
- ESIA
- Operation & maintenance supervision of water purification plant