Kafr Soliman Transmission Line from Kafr Soliman Water treatment plant to The Booster Pumping Station at Ras El Bar City Urban Extension (IWSP).

Country :

‎ Egypt

Client :

Damietta Potable Water & Wastewater Company

Project Value : ‎

260 million EGP

Owner :

Damietta Potable Water & Wastewater Company

Start/End Date :

2015-2022

Project Description :

-        Transmission line from Kafr Soliman WTP to the Booster Pumping Station at Ras El Bar City Urban Extension Damietta Governorate.

-        Water supply system to Ras-EL-Bar City, including water transmission line from WTP at Soliman Village to Ras El-Bar City with a diameter of 1000 mm and length of 17 km

 

Services provided :

-        Design calculations and detailed drawings

-        Preparation of tender documents.

-        Review, Approval of shop drawings, technical submittals & As-built drawings.

-        Construction supervision.