New Cairo City
Potable Water Purification Plant 500,000 m3/day Phase 2
Country :
Egypt
Client :
Construction Authority for Potable Water and Waste Water
Project Value :
1.2 Billion EGP
Owner :
New Cairo City Authority - New Urban Communities Authority (NUCA)
Start/End Date :
2019-2022
Project Description :
Design review and supervision of construction for New Cairo Water Purification Plant second phase 500,000m3/day to reach 2 million m3/day after finishing the four phases
- (1) Gravity line for water distribution for new Cairo city with diameter (1800mm)
- (2) Treated Water pump station with 2 pressurized lines diameter 1000 mm each to the New administrative Capital
- (8) Clarifiers,
- (22) Filtration unit with ground tank under them with volume 20,000 m3/day.
- Ground tanks each one 30,000 m3/day
Chlorination building, chemical building, generator and transformer building and laboratory building.
Services provided :
- Review, Approval of shop drawings, technical submittals & As-built drawings.
- Construction supervision.