The project consists of design review, preparation of shop drawings and contraction supervision of wastewater treatment plant with capacity 280,000 m³/day
Tertiary treatment for reuse including sludge handling units.
Services provided :
- . Design calculations and detailed drawings
- Preparation of tender documents.
- Review, Approval of shop drawings, technical submittals & As-built drawings.
- Construction supervision.