Wastewater services for deprived villages (Sakkara- Meet Rahina- ElMaraziq)- Badrasheen wastewater plant 170,000 m3/day.

Country :

Egypt

Client :

Construction Authority for Potable Water and Wastewater (CAPW)

Project Value : ‎

25,405,600 USD- 500 Million EGP

Owner :

Giza Potable Water & Wastewater Company

Start/End Date :

2009-2012

Project Description :

The purpose of the project was the provision of sewage facilities to three big communities (Sakkara – Meet Rahina – Maraziq) in the vicinity of Giza Pyramids This facility comprised the construction of Wastewater Collection and Conveyance System including Gravity lines (from 200 mm dia to 1,200 mm dia), Force Mains and Pumping Stations. and the construction of a Wastewater Treatment Plant of a capacity of 170,000 m³/day

Services provided :

- Design calculations and detailed drawings
- Preparation of tender documents.
- Review, Approval of shop drawings, technical submittals & As-built drawings.
- Construction supervision.