Abu Oweikal Water Purification Plant 500,000 m3/day

Country :

Egypt

Client :

Construction Authority for Potable Water and Waste Water

Project Value : ‎

1.4 Billion EGP

Owner :

Greater Cairo Water Company

Start/End Date :

2008-2020

Project Description :

Project consists of Intake pump station, booster pump station, Purification plant and two Transmission lines
- Intake pump stations include 4 pumps with capacity 2000l/sec and 120 m head
- Booster pump station includes 4 pumps with capacity 2000l/sec and 21 m head
- Water purification plant capacity 500,000 m3/day
- Two Transmission lines with 16 Km length each.
Each line is of 1400mm diameter and 16 bars operating pressure.

Services provided :

- Design calculations and detailed drawings
- Preparation of tender documents.
- Review, Approval of shop drawings, technical submittals & As-built drawings.
- Construction supervision.
- ESIA
- Operation & maintenance supervision of water purification plant