New Administrative City Main Sewage collector from regional road to Wastewater treatment plant
Country :
Egypt
Client :
HA Construction (Hassan Allam)
Project Value :
700 Millions EGP
Owner :
New Urban Communities Authority (NUCA)
Start/End Date :
2018-2020
Project Description :
- Main Sewage collector with diameter 2500-3500 mm for the new administrative Capital with total length of 11km
- Temporary lift pump station with capacity 135000 m3/day
- Temporary forcemain line with diameter of 600mm , and total length 5 km connected to go Badr City gravity network
Services provided :
- Review of design calculations & detailed drawings
- Review of Project documentations
- Preparation of work shop drawings & As-built drawings.
- Technical support during construction.