New Cairo City Water Intake, boosters, and transmission line to New Cairo water purification plant
with capacity 2,000,000 m3/day.
Country :
Egypt
Client :
NasrGenral Contracting Co.(Hassan Allam)
for Construction Authority for
Potable Water and Waste Water
Project Value :
1.7 Billion EGP
Owner :
1New
Cairo City Authority - New Urban Communities Authority (NUCA)
Start/End Date :
2007-2010
Project Description :
- Nile River intake 2,000,000 m3/day
- (4) Boosters with a capacity of 2,000,000m3/day
- (3) Transmission pipe lines with diameter 2200 mm each and a length 30 km each.
Services provided :
- . Review of design calculations & detailed drawings
- Review of Project documentations
- Preparation of work shop drawings & As-built drawings.
- Technical support during construction.