New Delta Project (Mostakbal Misr)
Irrigation Water Transmission Line of 10 million m3/day
& Main Pump Stations (2,3,4,5,6 )
Country :
Egypt
Client :
1- Concord Engineering & Contracting Company 2- Elswed Company
3- Wahba Contracting Company 4- Al-Kawthar Company
for Armed Forced Engineering Authority – Water Department
Project Value :
9 Billion EGP
Owner :
Ministry of Water Resources and Irrigation (MWRI)
Start/End Date :
2022-2024
Project Description :
Nile intake with (5) main pumping stations with capacities (10 million m3/day) per each
- to transfer irrigation water from the Rashid Branch till West of the Regional Ring Road and West of Sheikh Zayed City to Mostakbal Misr Reclamation Project.
Services provided :
- . Review of design calculations & detailed drawings
- Review of Project documentations
- Preparation of work shop drawings & As-built drawings.
- Technical support during construction.