Sharkia Integrated Waste Water Project Abo kebeer A, Abo kebeer B and Abo El Taweela wastewater collection system and treatment facility. El Sharkia Waste Water Pump Stations (IWSP)
Country :
Egypt
Client :
Sharkia Potable Water & Wastewater Company IWSP
Project Value :
300 million LE+ 80 million Euro
Owner :
Sharkia Potable Water & Wastewater Company
Start/End Date :
2017-2020
Project Description :
Abo Kbeer A project in 3 villages (Elrahmania, Khelot Elshorfa, and El-Demeen): The projects in 3 different villages includes: 17,599.85 m of wastewater networks, 11,165.00 m of force main line, 1100 m of house connection, 900 manholes and four open drill cross channel and three hydraulic canal crossing and two Main wastewater pumping stations with 9075m3/day m3, 7776 m3/day (30 l/ sec) capacity and one Secondary wastewater pumping station with 1300 m3 (15 l/sec) capacity.
Abo kbeer B project in 4 villages: (Kafer El-aaser, Elshobaky, El-Mosalmia and El-tal): The project in Four different villages includes: 13,339m of wastewater networks, 6575 m of force main lines, 8250 m of house connections, 619 manholes and two hydraulic canal crossing and one wastewater pumping station with 4,320m3 (50 l/sec) capacity
Abo El Taweela project in 4 villages (Abo -Gad, Eltaroty, El-Shwesh and El-khalila); The projects in Four different villages includes: 16275 m of wastewater networks, 11,165.00 m of force main line, 10358 m of house connection, 747 manholes and three open drill cross channel and, Two wastewater pumping stations with 13,479 m3/day and 6,750 m3/day Capacity
Services provided :
- Review, Approval of shop drawings, technical submittals & As-built drawings.
- Construction supervision.